Front Five Building Services have been appointed to undertake the new central energy plant installation to the 103 bedroom student accommodation complex in Liverpool, by an established client that needs the highest quality installation without disruption to clients.

The new system is to be situated in a very tight plant space within the lower floors of the newly built accommodation building and has to operate around existing clients and meet a challenging timescale to ensure the systems are upgraded without downtime. This was an ideal opportunity for our client to benefit from our BIM 3D design capabilities and create solutions prior to our team setting foot on site.

The works that are carried out will provide an eco-friendly solution for the entire building and will include an upgraded BMS system which will assist in reducing the carbon footprint as well as long term reduction of energy to the facility.